NFL Fan Forum Home

NFL Fan Forum > NFC North > Detroit Lions > The Lions - Headquarters and Training Facility


Forum Jumper
Football Field
Players
Locker Room
NFL Draft
Fantasy Football
NFC North
Chicago Bears
Detroit Lions
Green Bay Packers
Minnesota Vikings
NFC South
Atlanta Falcons
Carolina Panthers
New Orleans Saints
Tampa Bay Buccaneers
NFC East
Dallas Cowboys
New York Giants
Philadelphia Eagles
Washington Redskins
NFC West
Arizona Cardinals
San Fransisco 49ers
Seattle Seahawks
St. Louis Rams
AFC North
Baltimore Ravens
Cincinatti Bengals
Cleveland Browns
Pittsburgh Steelers
AFC South
Houston Texans
Indianapolis Colts
Jacksonville Jaguars
Tennessee Titans
AFC East
Buffalo Bills
Miami Dolphins
New England Patriots
New York Jets
AFC West
Denver Broncos
Kansas City Chiefs
Oakland Raiders
San Diego Chargers
  



Main Menu
Not logged in

Login
Register 

Home
Members
Help
POTD

Extra Box
Your Content Here


Search

Search
Search by username

The Lions - Headquarters and Training Facility
AIM To Buddy  Digg This  Del.iscio.us  Fark  feedmelinks  Furl it!  Scuttle  Simpy  Spurl  YahooMyWeb  StumbleUpon

Moderated by: beerwolf
 

New Topic

Reply

Print
AuthorPost
petrick229
Tailgater

 

Joined: Fri Jan 2nd, 2009
Location:  
Posts: 26
Status:  Offline
Mana: 
MyPOTD: 
#1  Posted: Sun Jan 4th, 2009 01:58
voters: 0      
The Ford family not only made a commitment to bring the pride of the Detroit Lions back into downtown Detroit with the construction of Ford Field, but they also decided that the new training and practice facility would be rivaled by no other team in the National Football League.

The Lions' $35.5 million headquarters and training facility was built on a 22.7-acre parcel and is located just west of Detroit between Allen Park and Dearborn. In fact, the new facility is just down the street from Ford Motor Co.'s World Headquarters.

The franchise broke ground on the new state-of-the-art facility in August 2000 and moved into its new digs in March 2002. The 460,000 square foot complex includes a full indoor practice field, 2.5 outdoor practice fields, a state-of-the art weight and training room, a massive locker room, a hydrotherapy room, a spacious equipment room, a cafeteria, meeting rooms for each position, a player lounge, a 103-person auditorium for full team meetings and large press conferences, a studio, a library and archive room, a media room and offices for all personnel.

When entering the building from the main entrance, one is immediately hit with flashbacks of Lions football. A 23-by-26 foot mural is covered with the likes of nine Hall-of-Fame Lions players.

In an effort to keep the environment clean, William Clay Ford Jr. also made sure the building was built with renewable and recyclable products. The bamboo floors in the lobby, latex paint and rubber flooring have all contributed to this cause.

The facility also provides a full-size indoor field and 2.5 fields outside so the team has plenty of space for team practices.


Quote

Reply

PM

Report
petrick229
Tailgater

 

Joined: Fri Jan 2nd, 2009
Location:  
Posts: 26
Status:  Offline
Mana: 
MyPOTD: 
#2  Posted: Sun Jan 4th, 2009 02:01
voters: 0      
Lions Practice Facility and Headquarters Vitals
Project: Detroit Lions practice facility and headquarters
Location: Allen Park, Michigan
Site spans Allen Park and Dearborn with main entrance to facility located in Allen Park. Facility resides at the corner or Rotunda Drive and Southfield Freeway (M-39).
Site Size 22.7 acres
Project Size: 253,000 square feet (including outdoor practice fields)
Bulding Size: 115,000 square feet
Outdoor Practice Area Two full-sized regulation fields
Outdoor Practice Surface: Grass
Indoor Practice Area: 220' wide by 440' long
Height of Indoor Practice Area: 110'
Indoor Practice Surface FieldTurf
First Floor Includes: Indoor practice field, locker rooms (players, coaches and male staff), athletic training and rehab facilities, weight room, meeting rooms, auditorium, cafeteria, public lobby and media support area.
Second Floor Includes Chairman offices, administrative offices, football operations, broadcast studio, female staff locker room, observation platform for indoor field.
Construction Schedule 19 months
Groundbreaking August 7, 2000
Completion Date: March 2002
Grand Opening: April 22, 2002
Cost $34 Million
Property Owner Ford Motor Land Corporation
Architects: Gensler and Smith Group
Contractors and Project Manager: White/Olson, LLC


Quote

Reply

PM

Report

 Current time is 00:22
NFL Fan Forum > NFC North > Detroit Lions > The Lions - Headquarters and Training Facility


Currently viewing - 0 member(s) and 0 guest(s)


Icon Legend

Forum New Posts Topic New Posts
Announcement Important Topic Locked Poll




Skin City theme designed by: Skin City Designs
NFL Fan Forum is not affiliated with the NFL or it's affiliates
Use of the NFL logo is purely for artistic enhancement and does not imply any association with the NFL or it's affiliates



WowClassic 2.0 - Copyright © 2007-2008 Nancy Chandler